SHARE


A number of many years go, the Bruhat Bengaluru Mahanagara Palike (BBMP), weighed down by the city’s burgeoning garbage challenge, determined to established up 15 bio-methanisation crops to procedure inexperienced waste (soaked squander). That way, the civic overall body hoped to help save on the transportation price to landfills whilst at the similar time managing squander in just town limits.

With this in head, 13 bio-methanisation plants have been established up. The electrical energy produced from bio-fuel was utilized to electrical power streetlights. On paper, it appeared like an eco-welcoming remedy to the garbage crisis.

Slice to November 2017: As lots of as 11 bio-methanisation vegetation have shut down. Whilst 10 vegetation — managed by Ashoka Biogreen Pvt. Ltd. — stopped operations in December 2016 over ‘non-payment of bills’, 1 plant getting managed by Mailhem Engineers Pvt. Ltd. was handed in excess of to the BBMP in Oct this calendar year soon after the deal ended. Currently, only two of the 13 crops are functioning.

Sunil Raisoni, director of Ashoka Biogreen Pvt. Ltd., advised The Hindu that the enterprise experienced bagged the tender to established up 12 vegetation. Nevertheless, with the BBMP unable to supply land for two crops, they manufactured only 10 and commissioned them amongst April 2014 and July 2015. “To date, the BBMP owes us somewhere around ₹24 crore. That aside, with the civic system not sending ample moist squander to the plants, their performing was adversely afflicted,” he said.

According to Mr. Raisoni, the BBMP set up a Scrutiny Committee to take care of the situation of pending dues. In March 2017, the committee reportedly suggested that the contractor be paid.

“However, we have not acquired any payment from the BBMP. We have prepared around 3,000 letters from the start out of the undertaking with regard to payments,” he claimed. While the task was funded by the 13th Finance Fee, the BBMP unsuccessful to launch payments on time.

Mailhem Engineers Pvt. Ltd. was controlling a few vegetation in Mathikere, Kuvempunagar and Gandhinagar wards. Naveen A.R., territory manager of the business, claimed that they keep on to function the plant in Kuvempunagar and Gandhinagar. “The tender for the plant in Gandhinagar will stop in March 2018. The plant in Mathikere has currently been handed above to the BBMP. Unfortunately, it is not remaining preserved,” he mentioned.

Civic physique to choose over functions

Sarfaraz Khan, BBMP Joint Commissioner (Reliable Squander Administration), acknowledged that most bio-methanisation crops have been shut down. He reported that Ashoka Biogreen experienced not been running the plants as for every the normal running method.

The firm has denied this allegation.

Mr. Khan stated that the BBMP would before long just take over and function these crops by itself. “The zonal joint commissioners will be asked to oversee the operation and servicing of these vegetation. It is not rocket science, and the programs are presently in area,” he claimed, adding that the civic physique will also choose in excess of operating the waste management vegetation in Doddabidarakallu, Chikkanagamangala and Subbarayanapalya.

Details box

Bio-methanisation vegetation that have shut down

Web site

Ward

SKR Marketplace

K.R. Sector (139)

Near Nandini theatre, Nagapura

Nagapura (67)

Kanakapura Street Cross

Hemmigepura (198)

Gundutopu, Begur

Begur (192)

KCDC, Somasundarapalya

Singasandra (191)

3rd Block, 4th Main, Pattabhiramanagara

Pattabhiramanagara (168)

Upcoming to DWCC, Koramangala

Koramangala (151)

In the vicinity of Domlur flyover

Domlur (112)

Jayanagar South Conclusion Circle

Yediyur (167)

Panthur Dinne

Varthur (149)

Mathikere

Aramange Nagar (35)

What constitutes green/soaked waste

Kitchen waste

Leftover food stuff

Animal dung





Source backlink

LEAVE A REPLY

Please enter your comment!
Please enter your name here